The five-day floor cycle is a logistics problem, not a concrete one
Everyone benchmarks the pour. Almost nobody benchmarks the hoist. After tracking eleven towers we found that deck cycle time correlates far more tightly with vertical transport capacity than with mix design or crew size — and the fix is usually a schedule change, not a cost increase.